Application of Risk Management In Shipyards Based SNI IEC/ISO 31010:2016 on New Shipbuilding Projects

Main Article Content

Muhammad Firdaus Bin Yusup

Abstract

Shipbuilding in the shipyard needs to be analyzed for risk management to minimize and take action to avoid risk. Risk management techniques in SNI IEC/ISO 31010:2016, namely the consequence and probability matrix. This study aims to identify hazards in new construction works and determine the level of consequences and the probability of a risk arising. This research's benefit is knowing the danger and risk level category. This study uses qualitative research and data collection techniques through in-depth interviews or direct observation in the field. The results showed 14 hazards from 3 jobs: plate cutting, welding, and lifting. The risk analysis scale shows a very high risk (priority I). The high risk (priority II), medium-high risk (priority III), low risk (priority IV), and shallow risk (priority V) in new construction works.

Downloads

Download data is not yet available.

Article Details

How to Cite
Yusup, M. F. B. . (2022). Application of Risk Management In Shipyards Based SNI IEC/ISO 31010:2016 on New Shipbuilding Projects. Maritime Park: Journal of Maritime Technology and Society, 1(2), 75-78. https://doi.org/10.62012/mp.v1i2.32646
Section
Design and Analisys Structure of Ocean Building

References

International Electrotechnical Commission (IEC). IEC/ISO 31010:2009 Risk management – Risk assessment techniques. Geneva: IEC, (2009).

International Organization for Standardization (ISO). ISO 31010:2016 Risk management – Risk assessment techniques. Geneva: ISO, (2016).

Lützhöft, M., Dahlgren, J., & Kircher, A. A Framework for Risk Management in Ship Newbuilding Projects. WMU Journal of Maritime Affairs, 17(3), 397-417, (2018).

Jeong, W. Application of the Fuzzy Analytical Hierarchy Process to the Evaluation of Shipbuilding Project Risk. Journal of Coastal Research, 70(sp1), 378-383, (2014).

Kim, B. S., & Kang, H. S. A Study on the Risk Management of Shipbuilding Projects Based on the Monte Carlo Simulation Technique. Journal of the Korean Society for Quality Management, 40(1), 82-93, (2012).

Zhao, C., Wang, Z., & Wang, Y. Shipbuilding Project Risk Identification and Evaluation Based on Analytic Hierarchy Process. Journal of Coastal Research, 70(sp1), 394-399, (2014).

Teh, P. L., Chou, S. Y., & Ou, C. P. Risk Assessment for Shipbuilding Projects: A Fuzzy Analytic Network Process Approach. Journal of Marine Science and Technology, 20(6), 788-799, (2012).